Filter content by survey:

End of Leg


Cleaning & Packing

Task FPC Deck Lead Safety Lead
1. All tools cleaned and replaced in their proper case and location
✓ ✓
2. Check survival suit inventory, to ensure all incoming scientific Personnel have a suitable size
✓ ✓
✓
✓
5. Clean and dry on-deck ID guides
✓
6. Clean and vacuum state rooms and remove trash (each leg!)
✓ ✓ ✓
7. Collect all boots and rain gear loaned to interns and others as they depart the vessel
✓ ✓
8. For completed otolith trays:
• Make sure caps are tightened and trays are scrubbed with dilute bleach solution and subsequently dried
✓
✓
9. Freshwater rinse all metal tools and parts (bolts, washers, nuts etc.) that have been on deck and exposed to saltwater
✓
10. Full ethanol and formalin buckets capped with uncut lids and buckets properly labeled
✓
11. Put frozen specimens in freezer boxes, properly labeled and seal with tape and ship
✓
12. Remaining ethanol and formalin properly stored and labeled
✓
13. Scrub and pressure-wash deck tables, baskets, and white totes
✓
14. Stuff all used bedding and pillows in trash bags labeled USED
✓ ✓ ✓
✓ ✓


Data Administration

Task FPC Deck Lead Safety Lead
1. Completed forms from FPC filebox
✓
✓
✓
4. HAND CARRY paper forms back to Seattle
• Collect data sheets (HAULFORMs, ES80 LOG SHEETS, etc) and hand carry to Seattle
✓
5. HAND CARRY thumbdrive and/or hard copies back to Seattle
• CATCH computer - Make copies of photos from leg directory (C:/Data/Photos)
✓ ✓
• CATCH computer - Make copy of METIS data in C:/data directory
✓ ✓
• CATCH computer - copy Catch, Length and Specimen App CSV files from bluetooth directory (C:/Users/NOAADATA/Documents/Bluetooth/inbox) **please note: The RAW Catch and Specimen CSV files off of tablets should also be hand carried to Seattle following each leg**
✓ ✓
• CTD computer - make copies of CTD files from the leg
✓ ✓
✓
✓ ✓
• MARPORT sensors - make copies of A2S files from all sensors used on the leg
✓
• MARPORT/SCALA computer - make copies of .sds files (use Mac compatible thumb drive)
✓
• POSEIDON computer - Make copies of all BTD, BTH, BC2, and .xml/zip files
✓
✓
• POSEIDON server - make copies of 7zip files
✓
6. Prepare progress report for each Scientific Project assigned to the vessel for the next leg's deck lead
✓
7. Record the quantity of packages associated with each project and email or deliver that information to the Scientific Projects Coordinator
✓


General

Task FPC Deck Lead Safety Lead
1. All injuries (ergonomic or other) and near misses should be submitted to the AFSC Incident Report Form
✓
✓
3. Fuel
✓
4. Pass Fishing Gear Field Report spreadsheet to incoming FPC (make sure they know where it is located on the computer)
• EBS/NBS
✓
• GOA/AI
✓


If you see mistakes or have suggestions, please open an issue on GitHub or contact the maintainer below:
Sarah Friedman (Sarah.Friedman AT noaa.gov)